1. <s id="7e04s"><table id="7e04s"></table></s>
      <li id="7e04s"><option id="7e04s"></option></li>

        <center id="7e04s"><acronym id="7e04s"></acronym></center>
      1. <meter id="7e04s"></meter>
        <dfn id="7e04s"><center id="7e04s"></center></dfn>
      2. 亚洲综合精品成人,99国产精品自在自在久久,国产精品先锋资源站先锋影院,国产精品无码一区二区三区电影,忘忧草在线社区www中国中文,欧美白人最猛性xxxxx,一区二区国产高清视频在线 ,亚洲AV天天做在线观看
        Current Location:Home > Product > Steel wire annealing > Aluminum bar forging furnace

        2020-07-20 17:48:44

        Share
        • Share to WeChat Moments

        Round steel forging diathermy equipment

        • Description

        圖片012.png

        Operation steps of round steel forging diathermy equipment and bar diathermy forging equipment

        1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

        2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

        3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

        4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

        5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

        6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

        7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


        Maintenance of round steel forging diathermy equipment and bar diathermy forging equipment

        When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

        高頻10.jpg


        Recommended Products

        HOME About Us Product News Case Video Advantages Contact
        主站蜘蛛池模板: 亚洲av日韩av永久无码电影| 又黄又爽又无遮挡免费的网站| 国产草草影院ccyycom| 久久月本道色综合久久| 精品亚洲国产成人av| 国产精品美女久久久久久麻豆| 国产精品自在自线免费观看| 成人午夜免费无码视频在线观看| 亚洲欧美日本久久网站| 中国熟女仑乱hd| 亚洲中文字幕国产综合| 视频一区二区不中文字幕| 欧美另类videossexo高潮| AV最新高清无码专区| 国产叼嘿视频一区二区三区| 蜜臀av性久久久久蜜臀aⅴ麻豆| 日韩精品国产中文字幕| 国产精品免费看久久久| 亚洲全乱码精品一区二区| 国产欧美精品一区二区三区-老狼 真实单亲乱l仑对白视频 | 亚洲av色在线观看国产| 中文字幕人妻无码一区二区三区| 色综合人人超人人超级国碰| 人妻综合专区第一页| 亚洲人成色99999在线观看| 91精品国产综合久蜜臀| 亚洲综合另类小说色区色噜噜| 日韩一区二区三区精品区| 国产精品成人一区二区三区| 无码无需播放器av网站| 人妻日韩精品中文字幕| 国产成人无码免费视频在线| 国产中年熟女高潮大集合| 免费特黄夫妻生活片| 久热这里只有精品在线观看| 亚洲av本道一区二区| 国产成人一区二区三区视频免费| 九九热视频精选在线播放| 日韩成人一区二区三区在线观看| 国产又爽又黄又刺激的视频| 国产精品视频一区二区亚瑟|