1. <s id="7e04s"><table id="7e04s"></table></s>
      <li id="7e04s"><option id="7e04s"></option></li>

        <center id="7e04s"><acronym id="7e04s"></acronym></center>
      1. <meter id="7e04s"></meter>
        <dfn id="7e04s"><center id="7e04s"></center></dfn>
      2. 亚洲综合精品成人,99国产精品自在自在久久,国产精品先锋资源站先锋影院,国产精品无码一区二区三区电影,忘忧草在线社区www中国中文,欧美白人最猛性xxxxx,一区二区国产高清视频在线 ,亚洲AV天天做在线观看
        Current Location:Home > Product > IF induction series > Silicon controlled medium frequency forging furnace

        2020-07-21 16:25:04

        Share
        • Share to WeChat Moments

        Infrared temperature measurement forging furnace

        • Description

        Operation steps of infrared temperature measurement forging heating furnace

        1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

        2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

        3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

        4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

        5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

        6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

        7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


        Maintenance of Forging Furnace with Infrared Temperature Measurement

        When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

        高頻10.jpg



        Recommended Products

        HOME About Us Product News Case Video Advantages Contact
        主站蜘蛛池模板: 99RE6在线视频精品免费下载| 加勒比中文字幕无码一区| 一二三四中文字幕日韩乱码| 一本一道av无码中文字幕麻豆 | 国产高清一区二区不卡| 撕开奶罩揉吮奶头视频| 亚洲AV日韩精品久久久久| 国产久爱免费精品视频| 尤物视频色版在线观看| 特级做a爰片毛片免费看无码| 亚洲av二区三区在线| 国产性色的免费视频网站| 97人妻天天爽夜夜爽二区| 久久精品国产一区二区三| 国产精品午夜福利资源| 免费人成在线观看网站 | 杂多县| 91老熟女老人国产老太| 亚洲成av人片无码天堂下载| 国产激情免费视频在线观看| 国产亚洲精品合集久久久久| 久久久久久综合网天天| 亚洲肥老太bbw中国熟女| 一区二区三区久久精品国产| 樱花草视频www日本韩国| 国产欧美日韩一区二区加勒比| 日韩精品三区二区三区| 亚洲精品日韩中文字幕| 亚洲综合另类小说色区一| 亚洲色成人网站www永久下载| 四虎国产精品免费久久| 国产乱码精品一区二三区| 成人免费ā片在线观看| 日本真人做爰免费视频120秒| 九九久久自然熟的香蕉图片| 国模肉肉视频一区二区三区| 欧美人与zoxxxx另类| 亚洲 中文 欧美 日韩 在线| 美女禁区a级全片免费观看| 国产精品99精品久久免费| 国产黄色一区二区三区四区|